Always provides
professional services
for operating gearbox
You Choose
Generated power of wind turbine: 0.85MW Primary engine manufacturer: Gamesa Gearbox manufacturer: Echesa
The 3rd (2019) China Wind Power Transmission Cooperation Forum of Nanjing AVIS was grandly opened
2019.08.23Nanjing AVIS won the honorary title of “Nanjing Engineering Research Center”
2019.04.22Nanjing AVIS held fire safety knowledge training
2019.03.26Congratulation!AVIS won the outstanding private enterprise award and the top 10 award for economic contribution and progress
2019.03.18The fourth meeting of the AVIS 2018 wind farm transmission chain failure solution——Zhangjiakou, Hebei
2018.06.29AVISTT——Take You To The Leading Mode Of American Wind Energy Market
2018.05.03The 2017 Beijing International Wind Energy Exhibition and AVIS exhibition show ended perfectly
2017.10.22AVISTT Will Attend AWEA WINDPOWER in May 2017
2017.05.01An AVISTT Self-Designed Gearbox Successfully Replaced a Mitsubishi 660 KW Model Gearbox
2017.04.03China Wind Power 2016 and the HQ Exhibition Ended Successfully
2016.10.25China Wind Power 2015 and HQ Exhibition Successfully Concluded
2015.10.17China Wind Power 2014 and the HQ Exhibition Ended Successfully
2014.10.26